Semi-variable costs

Semi-variable costs are those that have both fixed cost and variable cost elements. For example, a manufacturer's electricity bill may include elements that are fixed (such as lighting that is required regardless of the level of production) and elements that are variable (such as the electricity used by machinery directly involved in manufacturing).

moneyterms.co.uk
Copyright © Graeme Pietersz 2006-2008. All rights reserved. Ads may be inserted by, and rights in them owned by, third parties. ISPs may not alter pages (including externally loaded elements) or track visitors.